STS Static Transfer Switch 400kW
STS Static Transfer Switch 400kW

STS Static Transfer Switch 400kW

Product Details:
Place of Origin: China
Brand Name: SINOSoar
Certification: CE
Model Number: STS400HC
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: 2889 USD~4000USD /piece
Packaging Details: Wood Box
Delivery Time: 35~45days
Payment Terms: TT
Supply Ability: 200pieces/month

  • Fast Delievery
  • Quality Assurance
  • 24/7 Customer Service
Product Introduction

Microgrid controller (STS) is composed of four parts: fast switching, high precision detection, logic control and
external communication. Can 
automatically complete and off-grid switching and grid parallel function. The
active switching and off-grid time is 0ms, the passive switching 
time is 20ms (typical), and the switch can be
achieved within 4ms through customization.
STS1.png

01
Internally integrated LocalEMS
02Seamless switching function
03Three phase bidirectional control


Type designationSTS400HC
Input/ Output  (AC)
Rated power400KVA
Rated  voltage230V/400VAC(-20%/15%)
Rated grid frequency50 Hz/60HZ /(+/-5Hz )
Max. power440KVA
Max. current660A
General Data
Dimensions (W * H * D)420*360*650
Weight63KG
Degree of protectionIP5x
Operating  temperature range-30 ℃ to 60 ℃
humidity range0 % – 100 %
Cooling methodTemperature controlled forced air cooling
Max. operating altitude4000 m(>3000m derating)
CommunicationRS485*3 / modbusTCP / CAN/4G
DI:8   DO:8
Switch time (PCC)< 10ms

In the energy storage system, the main function of PCS is to control the energy bidirectional and realize the absorption
or discharge of power grid energyTherefore, PCS has a certain tolerance to abnormal fluctuations of the power grid
(such as undervoltage, overvoltage, wave drop, frequency anomalies, etc.). Therefore, for the energy storage system
with off-grid switching requirements, the abnormal judgment of the grid voltage is usually more tolerant, and only the
grid is disconnected and off-grid switch to achieve off-grid power supply, to ensure the stability of the system, and the
typical passive switching time is recommended to be 20ms
However, for occasions with high requirements for power supply,
PCS is required to quickly detect abnormal grid waveform and
respond quickly to ensure the quality of power supply.
However, this application may have an impact on the charge and
discharge of energy storage power, that is, if the
grid waveform is abnormal, it will switch to the off-grid state,regardless 
of  whether it is in the state of energy
storage charging or discharge at this time. For this case, even the use of VSC virtual synchro 
technology can
not solve the abnormal waveform, because the virtual synchro can only supplement the active and reactive power 
of the energy and impedance of the cycle level, but can not compensate the instantaneous voltage waveform.
Therefore, to obtain 
the best voltage waveform, only off-grid operation, pure power supply provided by the inverter.


You Might Also Like